Description
Product Description
Upgrade your bathroom with this 2-piece memory foam bath rug set featuring a soft coral fleece surface and thick cushioned padding that feels like stepping on soft sand. The super absorbent microfiber quickly soaks up water to keep your floors dry, while the non-slip backing keeps the rugs firmly in place for a safer, cozier step every day.
Key Features
- Soft & Absorbent: Thick foam padding with plush microfiber absorbs water quickly, so puddles never sit on the surface and your feet stay warm off cold tile floors.
- Non-Slip Backing: Reliable rubberized base grips the floor firmly, even in damp conditions, reducing slips and falls for adults and kids (place on a dry, clean floor for best results).
- Machine Washable: Simply toss into a laundry bag and wash, then tumble dry low; colors stay bright and fresh wash after wash.
- Comfortable Support: The 40D foam core molds to the shape of your feet, soothes tired muscles, and relaxes your feet while you bathe or get ready.
- Fiber-Locking Design: Unique fiber-locking construction resists shedding and fading, keeping the pebble-textured rug set looking new for long-term daily use.
Specifications
| Material | Polyester microfiber surface with foam padding and non-slip backing |
| Size | Bath rug 16 x 24 inch (40 x 60 cm); U-shaped toilet rug 16 x 20 inch (40 x 50 cm) |
| Quantity | 2-piece set: 1 bath mat + 1 U-shaped toilet mat |
| Care | Machine washable, tumble dry low, colorfast |
Application Scenarios
Ideal for placing beside the tub, shower, toilet, sink, or vanity, this absorbent bath mat set also works great in other rooms of your home. bathroom, bathtub side, shower, toilet, vanity, bedroom, daily use
Delivery Timeframe
Please note that we cannot guarantee the exact date of arrival, and the delivery timeframes (excluding weekends and public holidays) are as follows:
- For customers in Victoria, approximately 7-10 working days;
- For customers in NSW, SA, ACT, and QLD, approximately 9-12 working days;
- For customers in WA, NT, and TAS, approximately 9-12 working days.






